Glass Curtain Wall Systems

The modern skyline language. Hanart engineers and delivers aluminum-framed glass curtain walls — unitized and stick-built — floor-to-ceiling transparency with engineered thermal, acoustic and fire performance.

U-value from 1.2 W/m²·K Unitized & Stick-Built Fire-Rated Options EI 60/120 Floor-to-Ceiling Glass
Systems

Two proven construction methods

Unitized Glass Curtain Wall

Factory-assembled and glazed modules crane-lifted into place. The choice for towers above 50 m where speed, quality control and weather-tightness decide the program.

  • Module 1.2–2.4 m × 3.2–4.2 m
  • 2–3 panels installed per crane per day
  • Factory glazing QC and pressure testing
  • Watertightness Class R7–R8
Unitized systems detail →

Stick-Built Glass Curtain Wall

Site-assembled mullions, transoms and infill glass. The lowest-cost conventional system for mid-rise buildings with flexible response to irregular geometry.

  • Mullions & transoms 60–180 mm sightline
  • Thermal-break frame profiles
  • Glass 6–19 mm insulating units
  • Ideal ≤ 60 m building height
Stick-built systems detail →
Specifications

Glass curtain wall performance envelope

Indicative values from Hanart-verified assemblies; final values confirmed per project by full-scale mock-up testing.

Parameter Standard Premium
U-value1.4–1.6 W/m²·K1.0–1.2 W/m²·K (triple to 0.9)
SHGC0.30–0.450.18–0.30
Visible light transmittance50–65%35–55%
WatertightnessClass R6Class R7–R8
AirtightnessClass A2Class A3
Wind load resistance≥ 2.4 kPa≥ 3.5 kPa (hurricane-rated)
Acoustic insulationRw 35–38 dBRw 42–46 dB
Fire rating (option)—EI 60 / EI 120 perimeter
Engineering

Balanced facade engineering

A curtain wall is an engineering compromise — daylight, thermal performance, solar control, acoustic comfort, structural safety and cost must be balanced together. Hanart runs the full calculation set on every project: thermal, condensation, structural, seismic, fire and water management.

  • Thermal & condensation risk analysis (ISO 10211)
  • Structural design for wind, seismic and thermal movement
  • Solar control glass specification per facade orientation
  • Acoustic design to interior noise targets
  • Fire, smoke management and perimeter barriers

More about our engineering & BIM →

Section detail through glass curtain wall showing thermal break frame, insulation and slab edge fire barrier
FAQ

Glass curtain wall questions, answered

A curtain wall is a non-structural facade hung on the building's edge, spanning from slab to slab and carrying only its own weight plus wind load. A window wall sits on the slab, transferring its weight to the floor structure. Curtain walls allow floor-to-ceiling glass and are the standard for commercial towers.

With thermal-break frames and high-performance coated insulating glass, Hanart glass curtain walls achieve U-values from 1.2 W/m²·K (double glazing) down to 0.9 W/m²·K (triple glazing in cold climates), validated by full-scale mock-up testing.

Yes. Hanart supplies fire-resistant glass curtain walls using fire-rated glazing (up to EI 60/120), fire-stopping at floor edges, and perimeter fire barriers, engineered and tested to the project's local fire code.

From award to facade completion: 8–14 months for a typical 10,000–50,000 m² tower, including engineering (2–3 months), mock-up testing (1–2 months), fabrication (3–6 months) and erection (3–6 months). We provide a detailed program on review of your drawings.

Every project follows a full QA program: design reviews, full-scale mock-up testing (air, water, structural, thermal), factory QC with serial-numbered panels, site installation supervision, and performance testing on the completed building before handover.

Engineer a glass curtain wall for your tower

Send your drawings and performance targets. We'll recommend the system (unitized or stick-built), glass specification and preliminary budget within 24 hours.