Curtain Wall & Facade Supplier in Australia
Hanart supplies curtain wall systems to Australian projects — Sydney, Melbourne, Brisbane and Perth — engineered and compliance-managed for the NCC and AS/NZS facade practice, fabricated in Shanghai and shipped direct.
Engineering for Australian compliance and climate
Australia's facade market is sophisticated and compliance-driven, with high-rise activity in Sydney, Melbourne, Brisbane and Perth. Climate demands range from strong coastal wind in Sydney and Brisbane to extreme summer heat across the country, with high UV everywhere.
Hanart offers Australian architects and builders a full facade package: NCC-aligned engineering and documentation, EN/AS performance testing from established laboratories, thermal performance computation, and DTS or performance-solution support where needed.
Because fabrication stays in Shanghai while engineering and compliance are managed for the Australian context, clients get a documented, auditable trail from design to delivered panels — at factory-direct cost.
Comprehensive facade documentation aligned with the National Construction Code requirements, per project.
Air, water and structural testing to recognised EN/AS methods from established test houses.
Site wind pressures engineered for Sydney, Brisbane and Perth coastal exposure.
Drawings, test reports, compliance statements and QA records delivered with every package.
NCC-aligned engineering and documentation
Engineering follows the National Construction Code and Australian facade practice, including wind loading, thermal performance, fire and accessibility requirements as applicable to the building class. Hanart's documentation supports the builder's compliance submission.
Logistics route via Sydney, Melbourne, Brisbane or Fremantle ports. Hanart offers DDP with import duty and clearance, or CIF/FOB, with duty planning completed before shipment.
| NCC | National Construction Code applicable sections |
| Wind loads | AS/NZS 1170.2 site wind assessment |
| Thermal | NCC Section J thermal performance |
| Testing | EN 12152/12154-equivalent air & water classes |
Systems we deliver in Australia
Unitized curtain wall for commercial and residential towers, stick systems for landmark geometry, window wall for hotel and office, and rainscreen cladding systems. Feature glazing can be point-supported or cable-net.
Fabrication at the Shanghai plant is 100% seal-tested per panel, shipped packed and numbered, and documented against the registered drawings. Programs run 10–16 months from design freeze to completion in the Australian market.
Complete compliance documentation, spares, manuals and a structured warranty finish the package.
Sourcing a curtain wall supplier in Australia
Most Australia facade purchases start the same way: a technical brief, shortlisted suppliers, engineering review, mock-up, fabrication and site installation. Where the chain shortens — and the cost moves most — is keeping engineering and fabrication under one contract, which is how Sydney projects lock the approved price. Both happen at our Shanghai plant, so the price approved before fabrication is the price that holds for your Sydney project.
Engineering for Australia is prepared against National Construction Code applicable sections. Structural, thermal, acoustic and fire calculations are completed by our central team under NCC/AS practice, and licensed local consultants verify the package before fabrication is released.
Panels leave Shanghai with marine-grade packing, customs-classified documentation and numbered installation drawings, sequenced for the Sydney site program. For Australia we typically ship through Sydney, Melbourne or Brisbane terminals on DDP or CIF terms. Erection is carried out by locally permitted crews under Hanart supervision, with a site QA plan covering setting-out, sealant works and watertightness testing for Sydney conditions.
Typical briefs we price for Australia: airport and transport terminals, office and data-centre towers, hotels and mixed-use developments, retail and education estates.
Facade budgets, programmes and risk for Australian towers
A realistic facade budget for a Australia high-rise splits roughly 6–10% engineering and testing, 55–70% materials and fabrication, 10–15% logistics, and 15–25% on-site labour. The mix shifts with unitized versus stick-built systems and the mandated testing regime — both priced early for the project.
Cross-border facade procurement concentrates three financial risks for Australian projects: currency movement, duty changes and site-readiness sequencing. Hanart manages them with fixed-price engineering-to-install packages where possible, DDP terms to Sydney, Melbourne, Brisbane or Fremantle, and fabrication sequenced to installation order rather than one bulk shipment.
On site, tolerances, interfaces and weather windows carry the risk across Australia's varied climates. The QA plan covers joint setting-out, drainage and watertightness verification, and documents the record before handover to your team.
What a single-point facade package includes for Australian sites
One contract means one point of responsibility for engineering, cost, quality and schedule. When the site changes, one counterpart coordinates the fix across your team and ours — no relay of third parties.
- Engineering and local code verification for Australia
- Mock-up and performance testing undertaken before fabrication
- Per-panel full seal testing at the Shanghai plant
- Marine-grade packing, customs documentation and sequenced delivery to the nominated port
- Erection with local crews under Hanart supervision plus a QA record
- As-built documents, maintenance manual, spares and a structured warranty
Australia facade questions, answered
Yes — supply-only, supply-and-erect and design-assist packages, engineered and documented for the NCC, fabricated in Shanghai and delivered to Australian ports.
A documented engineering package aligned with the NCC, with test reports, thermal calculations and compliance statements supporting your submission.
DDP into Australia with import duty and clearance handled, or CIF/FOB. Duty, classification and documentation are planned before shipping.
Yes — specimens are tested to recognised EN/AS methods at established laboratories before production release.
10–16 months from design freeze to facade completion for a tower, aligned to your construction program.
Considering overseas suppliers? See Hanart in United Kingdom · USA.
Local verification and approvals for Australian projects
Approval of imported facade systems is a project-specific process, so Hanart packages the evidence your consultants and authorities expect: National Construction Code applicable sections calculations verified by a local engineer, custom-classified import documentation, and test certificates for the key performance classes. The same dossier is updated through revisions and issued in final form at handover, so the Sydney approval record is complete.
For tenders, the package is prepared in the format your procurement team requires and delivered as a fixed offer — typically six to twelve weeks from technical brief to priced proposal, including logistics through Sydney, Melbourne or Brisbane terminals.
Plan a facade for your Australia project
Send your drawings and location. You'll get a system recommendation engineered for Australian wind, rain and energy code — with logistics via Sydney, Melbourne, Brisbane or Fremantle and a programme estimate.