Facade & Curtain Wall Supplier in South Asia

Monsoon rain, seismic loads, tropical heat and fast-track programs. Hanart delivers curtain walls across India, Bangladesh, Sri Lanka and Nepal — designed for the climate, built to international QA standards.

India / Bangladesh / Sri Lanka / Nepal Monsoon-Rated R7–R8 Seismic Zone III–V Design CIF + Installation Support
Tropical Engineering

Four climate drivers, one facade strategy

Monsoon Rain

Rainfall intensities beyond many temperate standards. Drained and pressure-equalized systems with Class R7–R8 watertightness, tested to project rainfall data.

Tropical Heat

High solar load drives glazing specification: low-SHGC coated glass, thermal-break frames and optimized U-value to cut air-conditioning demand on the facade.

Seismic Loads

Movement-capable connections and slip joints absorb seismic drift. Engineering per India Zone III–V, Bangladesh and Nepal seismic design requirements.

Tropical UV

UV-stable sealants, coatings and gaskets selected for long-term performance under intense tropical sun — no premature ageing or color shift.

Coverage

Face to face with local partners

Hanart ships from Shanghai and works with vetted local installation partners in each market — combining Chinese fabrication efficiency with local knowledge, permits and labor.

India

Commercial towers and airports in Mumbai, Delhi, Bengaluru, Hyderabad and Chennai. Engineering to NBC and IS standards.

Bangladesh

Dhaka and Chittagong commercial and mixed-use towers — monsoon-drained systems and seismic movement design.

Sri Lanka & Nepal

Colombo, Kathmandu and emerging markets: high-rise glazing with tropical climate engineering and seismic resilience.

Export experience: complete logistics — export packing, CIF/C&F shipment, customs documentation, and on-site installation supervision with certified facade crews. Ask about your port.

Delivery Model

How a South Asia project runs

  1. Engineering & Shop Drawings — 6–10 weeks with mock-up approval
  2. Fabrication — 8–16 weeks in Shanghai with serial-numbered QC
  3. Shipping — export packing, CIF to your port, 2–4 weeks transit
  4. Installation — local crews + Hanart supervision, 10–24 weeks typical
  5. Aftercare — handover, documentation and 12-month warranty support

Turnkey and supply-only models are both available — see how we engineer and fabricate every package from the Shanghai plant. For a detailed delivery plan matched to your port and schedule, request a proposal.

FAQ

South Asia questions, answered

Yes. Hanart has delivered facade systems to South Asia, exporting engineered modules, glazing and hardware with local installation partners. We handle engineering, fabrication, shipping logistics (CIF/C&F), installation supervision and aftercare support.

South Asian projects are engineered for monsoon conditions: Class R7–R8 watertightness, pressure-equalized or drained system design, tested to project rainfall intensity, plus condensation control and tropical UV resistance for sealants and coatings.

Yes. Our engineering team designs curtain walls for seismic zone loads (including India Zone III–V and Bangladesh seismic zones), with movement-resisting connections, slip joints and post-elastic behavior verified in mock-up testing.

The most common model: Hanart completes detailed engineering and fabrication in our Shanghai plant, ships modules or profiles CIF to port, and delivers supervised installation with locally qualified facade crews trained to our QA standards. Turnkey and supply-only models are also available.

We deliver with complete export documentation (commercial invoice, packing list, CO, HS classification) and work with your local team or our partners on customs clearance and facade approvals. Duties and taxes are quoted transparently in your proforma.

Country profiles: India · Pakistan · Bangladesh

Plan a South Asia facade project

Send your drawings and location. We'll respond with a climate-appropriate system recommendation, logistics plan and quotation within 5 working days.