National Indoor Stadium, Beijing
Large-span metal roof and curtain wall on the 2008 Olympic programme. Envelope engineering compressed into an Olympic deadline — with the discipline to earn a Luban Prize the same year.
Read case study →Ten documented case studies, grouped by the building use they were engineered for. Compare an airport terminal against an airport terminal — the same discipline applied to the same class of envelope.
Every label below is taken from the project's own engineering record. Where a case spans more than one use, it is filed under the use that drove the envelope decision.

Large-span metal roof and curtain wall on the 2008 Olympic programme. Envelope engineering compressed into an Olympic deadline — with the discipline to earn a Luban Prize the same year.
Read case study →
A sculptural museum resolved in precast stone and point-supported glass. Curved volumes where daylight control is a curatorial requirement, not a preference.
Read case study →
Long-span terminal roof and curtain wall where drainage philosophy decides longevity. A Luban Prize in 2009 for an envelope that keeps moving 100,000 passengers a season.
Read case study →
Terminal curtain wall delivered as an expansion of a live airport — phased handover, operational interfaces and zero interruption to a growing flight schedule.
Read case study →
A 600-meter-scale standing-seam metal roof over an aircraft assembly hall. Zero-leak discipline above high-value production — holding dry since 2009.
Read case study →
A national research facility where stability of the envelope protects stability of the beamline. Luban Prize 2009 and one of 100 National Classic Projects of the 60th Anniversary.
Read case study →
A unitized curtain wall for a Pudong commercial complex. Factory fabrication and fast site erection on a constrained central-city site — Hanart's sixth Luban Prize.
Read case study →
A commercial envelope engineered for -40°C winters — thermally broken frames, condensation control and a construction window measured in months, not years.
Read case study →
A desert-climate facade engineered for high solar loads, sand abrasion and 50°C design temperatures — solar control resolved at the glass, not after the fact.
Read case study →
A unitized glass tower exported from Qingpu to Manhattan — logistics, US coordination and factory quality coordinated across twelve time zones.
Read case study →Send drawings, get a facade proposal in 24 hours — engineered, fabricated and installed by one contractor, one responsibility.